
Villa Renovation & Extension Company · Dubai
Villa extension and renovation contractors, from design to handover.
One contract, one project manager, all approvals handled.
★★★★★ 5.0 Google Rating | 25+ Reviews | Dubai-Based Team
Villa Projects Across Dubai
Before
After
Before
After
Before
After
Before
After
Before
After
Before
AfterVilla communities we serve
Emirates HillsPalm JumeirahJumeirah IslandsArabian RanchesThe SpringsJumeirah ParkDubai HillsThe MeadowsAl BarariWhat We Handle
Design to finishing, all under one contract and one project manager.
Design
Approvals & NOCs
Extensions & Structural
MEP

Joinery

Kitchens & Bathrooms

Flooring

Finishing
Villa Extensions
Need more space without moving? LuxRenov8 is a villa extension company in Dubai that handles the design, developer NOC, Dubai Municipality approval and construction under one contract.
Extra bedrooms, a master suite or a family room added to your existing villa, structurally engineered and matched to the original facade.
Enlarge the majlis, open up the kitchen or add a dining and entertaining space, with the layout shown in 3D before work starts.
Pergolas, covered terraces, outdoor kitchens and pool-side spaces that extend your usable living area.
Self-contained annexes, maid's rooms, home offices and garages built within your community's rules.
Recent villa extensions — before & after floor plans, added area in red



Included in every villa extension
Feasibility check3D design before buildDeveloper NOCDubai Municipality approvalStructural engineeringMEP & finishing to matchItemised fixed quotationWhy LuxRenov8
Google Reviews
★★★★★“We hired Lux Renov8 for a home renovation, and they exceeded all expectations. The team was professional, detail-oriented, and kept us informed throughout the process. The quality of their work was top-notch, and they completed the project on time and within budget. Our home looks incredible, and we couldn't be more satisfied.”
yamen aljandali, Verified Google Review
★★★★★“Our villa renovation went better than expected! The Lux Renov8 team was skilled and attentive to details. Our home now looks stunning!”
Villa owner, Verified Google Review
Process
Site Consultation
Design & Scope
Detailed Quotation
Execution
Handover
Free Estimate
Tell us about your villa. You'll receive a preliminary budget range, an estimated timeline, a design consultation and an overview of the developer approvals your project needs.
FAQ
Villa renovation in Dubai starts from AED 350 per sq. ft. for a standard specification, with luxury finishes starting from AED 650 per sq. ft. The final cost depends on villa size, scope (interiors, extensions, landscaping, pool) and finishes. After the free site consultation you receive an itemised quotation, so every line is clear before work begins.
Interior upgrades typically take 6–10 weeks; full renovations and extensions 14–24 weeks, including approvals. You get a committed timeline with your quotation.
Yes. We prepare drawings and manage submissions to the developer, community and relevant Dubai authorities on your behalf.
Yes. We phase works, seal off active zones and schedule noisy activities to keep the home liveable where the scope allows.
Payments are milestone-based and tied to completed stages of work, set out clearly in your contract.
Yes. As a villa contractor we design and build villa extensions — extra rooms, majlis, kitchens, covered terraces and upper-floor additions — and manage the developer, community and authority approvals they need, under the same contract as the rest of your villa renovation.
The cost of a villa extension in Dubai depends on the size, whether it is a ground-floor or upper-floor addition, the structural work involved and your finishes. We price every villa extension as an itemised fixed quotation after a free site visit and feasibility check, so each line is clear before you sign. For reference, villa renovation starts from AED 350 per sq. ft.; extension pricing is confirmed in your quotation.
Yes. A villa extension needs your developer or community NOC and approval from Dubai Municipality or the relevant authority, supported by structural and architectural drawings. As your villa extension contractor, we prepare and submit all of it for you.
Full renovations and villa extensions typically take 14–24 weeks, including approvals, depending on the size of the extension and authority timelines. You get a committed timeline with your quotation.
It depends on your community's rules, plot size and the build-up area allowed for your villa type. We check feasibility first, before any design work, so you know what is permitted and what it will involve.
Yes. We manage the villa extension and the renovation of the existing villa under one contract, with one project manager, so the new and existing spaces match in design, finishes and services.
Free consultation and an itemised quote from a design-and-build villa contractor.