Kitchen cabinets in Dubai have to cope with heat, humidity and daily cooking, so the board inside the cabinet matters as much as the door you see. At LuxRenov8, a standard kitchen renovation costs AED 30,000–45,000 and luxury custom kitchens with European appliances start from AED 70,000. Larger villa kitchens and bespoke layouts are quoted after a site visit. Custom cabinets take about three weeks to manufacture in our Dubai workshop and one to two weeks to install on site. Below we compare cabinet materials, door finishes and worktops, and explain what drives the price.
Prices are indicative 2026 ranges for supply and installation, based on LuxRenov8's published pricing. Every kitchen is different, so treat them as a planning guide, not a quotation.
Kitchen cabinet and renovation cost in Dubai at a glance
- Standard kitchen renovation: AED 30,000–45,000. The final figure depends on size, materials and layout.
- Luxury custom kitchen with European appliances: from AED 70,000.
- Larger villa kitchens: quoted after a site visit. Cabinetry, the worktop (quartz or natural stone), appliances and whether you move plumbing or open up walls are the big variables.
Add 5% VAT to any contract price and keep a 10–15% contingency for decisions made once work starts. If the kitchen is part of a bigger project, our guide to villa renovation cost in Dubai shows how it fits into a whole-home budget.
What drives the cost of kitchen cabinets
These are the factors that move the price most:
- Length of the cabinet run and number of tall units. Larder and appliance towers use the most material.
- Carcass material. Moisture-resistant board, plywood and aluminium each cost more than standard particle board, and last much longer.
- Door finish. PVC, acrylic, lacquer and wood veneer sit at very different price points.
- Internal fittings and hardware. Deep drawers, corner pull-outs and soft-close runners add cost and most of the day-to-day usability.
- The worktop. Material, thickness, edge profile and the number of cut-outs for sinks and hobs.
- Appliances. Integrated appliances need made-to-measure housings; freestanding ones do not.
- Layout changes. Moving the sink or gas, or opening a wall to create an open-plan kitchen, adds MEP work and approvals.
Cabinet materials that cope with Dubai's climate
The carcass, the box behind the door, is where cheap kitchens fail. Steam from the kettle and dishwasher, a slow leak under the sink and AC cycling all day put the board under constant stress. These are the main options:
- Moisture-resistant (MR) MDF or HDF. Stable, smooth and ideal for painted and lacquered finishes, provided every edge is sealed. It is the board we specify for our built-in wardrobes, paired with premium German hardware such as Blum.
- Plywood. Stronger screw-holding and good tolerance of moisture, but heavier and more expensive. A sensible choice for sink bases.
- Aluminium. It does not swell or rot, and copes with heat. For our kitchen renovation projects in Dubai we build modular and heat-resistant aluminium kitchen units designed for the UAE climate, which suit sink areas, rental properties and outdoor kitchens.
- Particle board (chipboard). The cheapest option and common in flat-pack kitchens. Once water gets in, it swells permanently, so avoid it around the sink and dishwasher.
Whatever the board, ask each contractor how the sink base is protected. A leak there is the most common reason kitchen cabinets need replacing early.
Door finishes: PVC, acrylic, lacquer or veneer?
We offer all four main finish families, and each suits a different kitchen:
- PVC. The most affordable, with a wide range of colours and wood-grain effects. Specify heat shields next to ovens, because heat can make the film lift over time.
- Acrylic. A deep, high-gloss look that wipes clean easily and resists moisture. Fingerprints and fine scratches show more than on matt finishes.
- Lacquer. Any colour in matt, satin or gloss, with a seamless modern look. Chips need a professional touch-up, but lacquer can be repaired rather than replaced.
- Wood veneer. Real timber grain and a warmer, more traditional feel. Keep it out of strong direct sun, which can fade natural wood.
For a handle-free look, choose integrated grip profiles or push-to-open hardware at design stage, because they change how the doors are made.
Worktops: quartz vs granite vs marble vs porcelain
We supply and install worktops in quartz, granite, marble, porcelain and solid surface. Each is templated on site, cut to size and installed with seamless joints and a matching splashback. How they compare:
- Quartz. Engineered, non-porous and consistent in colour, with no sealing needed. Use trivets, because very hot pans can mark the resin.
- Granite. A natural stone that handles heat and scratches well. Every slab is different, and it benefits from periodic sealing.
- Marble. The most luxurious look, but porous. Lemon juice and vinegar can etch the surface, so it suits show kitchens and owners who accept a lived-in patina. A honed finish hides marks better than polished.
- Porcelain. Very resistant to heat, stains and UV, with a slim profile and large slabs that can match your floor or walls. Edges need skilled fabrication to avoid chipping.
- Solid surface. Seamless, with integrated sinks and invisible repairs, but less heat-resistant than stone.
Planning the layout
We design around the working triangle between sink, hob and fridge, the storage volume you need and where each appliance sits, then present it as photorealistic 3D renders that you approve before anything is ordered. Points worth deciding early:
- Choose appliances before the drawings. Integrated fridges, ovens in tall units and the extractor duct route all fix cabinet sizes.
- Use drawers rather than shelves in base units, and full-height units to the ceiling. Recovering dead corners and voids often adds more storage than extra cabinets.
- Plan extraction for open-plan kitchens. Many Dubai families pair an open show kitchen with a closed back kitchen for heavy cooking.
- Match the joinery. If you are also replacing wardrobes or a TV unit, our custom wardrobes and cabinets can share the same finishes, so the home reads as one design.
Apartments
An apartment kitchen has to work within the tower. The sink and dishwasher are tied to the building's riser positions, you need an NOC from building management, and relocating gas lines or plumbing may also need a DEWA inspection. Most Dubai buildings only allow works from Monday to Friday, 9 AM to 5 PM, and materials go up by service lift. Our apartment renovation team handles these bookings in towers such as those in Dubai Marina.
Villas
Villas allow bigger moves: an island, a breakfast bar, or knocking through to create an open-plan kitchen and family room, a common request in Arabian Ranches villas. Opening a wall can be structural, so it needs a developer NOC and sometimes an authority permit. If the kitchen is one of several rooms, doing it as part of a wider villa renovation avoids paying for mobilisation and approvals twice.
How long do new kitchen cabinets take?
From the moment the design is signed off, plan for about four to five weeks of manufacturing and installation:
- Survey and measurement of the room and existing services.
- Design, 3D renders and samples. You approve the layout, finishes and hardware as physical samples.
- Approvals. Building or developer NOC, as needed.
- Workshop manufacturing: about three weeks. Cabinets are built to your exact dimensions rather than a fixed modular grid.
- Strip-out and MEP first fix, if the layout or services change.
- On-site installation: one to two weeks. Cabinets fixed, worktops templated and fitted, splashback, appliances and final adjustments.
Imported designer kitchens and natural stone can carry lead times of six to twelve weeks, so order them during design, not after demolition.
Replace or refresh your existing cabinets?
Not every dated kitchen needs to be torn out. If the carcasses are dry, square and solid, new doors, fronts, internal fittings and hardware can transform the look for a fraction of the cost of a new kitchen. Replacement makes more sense when:
- the sink base or bottom panels have swollen from water.
- hinges no longer hold because the board around them has crumbled.
- the layout does not work for how you cook, or you want an island or open-plan kitchen.
Vinyl wrapping is a cheaper cosmetic option, but it only changes the surface. It will not fix swollen board or worn hardware.
How to keep your kitchen budget under control
- Keep the sink and gas where they are unless moving them makes a real difference to how you use the room.
- Spend on what you cannot change later: the carcass, hardware and worktop. Door fronts are much easier to update in future.
- Ask for an itemised quote listing carcass material, door finish, hardware brand, worktop material and thickness, appliances and installation separately. A lump sum makes quotes impossible to compare.
- Check the warranty. We give a 5-year warranty on all our custom-built cabinets and wardrobes against manufacturing defects.
- Protect the investment afterwards. An annual maintenance contract catches leaks under the sink before they damage your new cabinets.
Frequently asked questions
How much do kitchen cabinets cost in Dubai?
A standard kitchen renovation with LuxRenov8 costs AED 30,000–45,000, and luxury custom kitchens with European appliances start from AED 70,000. Larger villa kitchens are quoted after a site visit, depending on size, materials, worktop and appliances.
What is the best material for kitchen cabinets in Dubai?
Moisture-resistant MDF or HDF, plywood or aluminium. Aluminium and plywood are the safest choices around the sink. Avoid standard particle board in wet areas, because it swells permanently once water gets in.
Is quartz or granite better for a Dubai kitchen worktop?
Both work well. Quartz is non-porous and needs no sealing, but very hot pans can mark it. Granite handles heat better and benefits from periodic sealing. Porcelain is the best choice where heat and UV resistance matter most.
How long does it take to install a new kitchen in Dubai?
Custom cabinetry takes about three weeks to manufacture in our workshop, and on-site installation typically takes one to two weeks.
Do I need a permit to change my kitchen layout?
Relocating gas lines or plumbing requires an NOC from your building management or developer, and potentially a DEWA inspection. We handle these approvals as part of the project.
Plan your new kitchen with LuxRenov8
LuxRenov8 designs, manufactures and installs kitchens with one accountable team, our own Dubai workshop, 3D renders before ordering and itemised pricing. See our kitchen renovation service in Dubai, or book a free design consultation. You can call +971 52 830 82 45 or WhatsApp +971 52 774 31 86.




